Holmes Chapel Neighbourhood Plan
Support Documents
Here's a list of documents referred to in the Plan:
Click on the links below to open or download a document.
Some links open documents or a library page scroll list on external websites.
- SG76 National Planning Policy Framework Document
- Town and Country Planning Act 1990 SDA02
- National Planning Practice Guidance SD/A07
- CEC Saved Local Plan First Review - Congleton BC 2005
- SG66 NP Questionnaire Survey Results 20/10/15
- COM19 NP Questionnaire Master v1.3 15/08/15
- SG04 Why does Holmes Chapel need a Neighbourhood Plan
- SG61 Consultation Statement
- SG41 LDF Background Report: Determining the Settlement Hierarchy Nov 2010
- HO15 Analysis of Holmes Chapel Demographics v1.5 14/09/15
- HO46 CEC Local Plan Population Projections and Forecasts Report SD019
- HO47 CEC Local Plan Spatial Distribution Update Report: Appendix 5
- HO16 Holmes Chapel Housing Stock Report v11 08/01/16
- CEC Local Plan BE014 Landscape Sensitivity to wind energy development May 2013
- CEC Local Plan BE020 Climate Change and sustainable energy planning research: Technical Report and erratum Sept 2011
- CEC Local Plan BE021 Climate Change and sustainable energy planning research: Summary Report and erratum Sept 2011
- CEC Local Plan BE023 Green infrastructure framework for NE Wales, Cheshire and the Wirral with appendices Mar 2011
- CE54 CEC Draft Cycling Strategy Oct 2015
- CE55 Local Air Quality Strategy Report for C E Council May 2011-2015
- CE37 Green Spaces Report
- SG60 NP second questionnaire analysis May 2015
- CE50 Report on Environmental Matters
- CE35 Report on Land Character
- CE59 Design Guide for Holmes Chapel Revision DRAFT
- CE53 Conservation Report
- SG11 Report on Census Data for Holmes Chapel 2001 / 2011
- CE57 CEC Design Guide Vol 1 Nov 2015
- CE58 CEC design Guide Vol 2 Nov 2015
- CE56 CEC Rights of Way Improvement Plan 2011-2016
- CE36 Report of survey of visitors to Victoria Club Fair 2015
- CE15 CEC Local Plan Green Space Strategy BE015
- SG68 Sustainability Statement Final
- SG33 CEC Draft Local Plan Submission vn 03/16 document library
- SG83 CEC Congleton BC Local Plan First Review Written Statement
- SG84 CEC Congleton BC Saved Policies schedule
- CW35 H C Health Centre Public Meeting Minutes - 04 11 15
- SG85 National Land use Classification Database 2006
- TT23 CEC Parking Strategy 2010
- TT24 Parking Standards - The Planning Service
- HO51 Holmes Chapel Housing Advice Note
- TT20 Car Parking Report
- TT26 SID Data analysis report summary to 12/12/15
- TT25 SID Locations to June 2016
- CE26 CEC Supplementary Planning Guidance note: provision of open space in new residential developments
- CW08 Meeting with Holmes Chapel Comprehensive School 20/04/15
- CW31 Meeting with Holmes Chapel Comprehensive School 15/10/15
- CW09 Letter from HCCS Governors re: new housing developments
- CW13 Meeting with HC Primary School Headteachers
- CW23 Meeting with Happy Days Nursery
- CW24 Meeting with HC Community Pre-School
- CW27 HC Health Centre Consultation Report July 2015
- CW12 Meeting with Communicare
- CW14 Meeting with U3A Group
- CW20 Meeting with Janet Haslam-Physiotherapist
- SG20 CEC Dane Valley Profile Statistics
- CE34 Footpaths Report (Access to the Countryside)
- HO48 Why has Britain stopped building bungalows (BBC)
- HO50 Holmes Chapel Housing Density report
- HO49 PS D015 Town & Country Planning (Jodrell Bank Radio Telescope) Direction 1973
- SG87 Cheshire 2016 Structure Plan Alteration 2016
- CW38 Report on Leisure Facilities v1.0 14/03/16
- SG88 CEC LPS proposed changes consultation document Mar 2016
- ES28 Holmes Chapel Business Survey
- ES29 Commuting Flows to Cheshire East and its settlements ONS
- TT14 Cycling Analysis report
- TT01 HGV Re-routing report
- HO43 CEC SHMA 2010 Economic viability of afforable housing
- SG86 Planning Use Classes
- SG89 Holmes Chapel site assessment report v1.0 26/04/16
- SG89 Appendix A Holmes Chapel areas of search map
- SG89 Appendix B Holmes Chapel NDP Natural Environment Constraints Map
- SG89 Appendix C Holmes Chapel NDP Policy and Built Environment Constraints Map
- SG89 Appendix D Holmes Chapel NDP Sites Map
- SG90 Sustainability Assessment Tool for Site Assessment v1.0 26/04/16
- SG91 Site Assessment Matrix v1.0 26/04/16
- SG92 HC Pre-submission Notification v1.2 28/04/16
- SG93 NP Policies Response form (paper vn) v1.2 28/04/16